Vastern Court inquiry documents library
Index table of the following documents
ID1 Letter from CHP Surveyors dated 21-4-22, rec 22-4-22
ID3 Additional Visual Material in Relation to Design by Roy Collado April 2022, rec 25-4-22
ID4 Notes by Michael Doyle on Figures
ID5 Design Code April 2022 rec 25-4-22
ID6 Appellant’s Opening Submission Rupert Warren QC 26-4-22
ID7 Local Planning Authority’s Opening Submission David Lintott 26-4-22
ID8 80 Caversham Rd storeys and heights
ID9 80 Caversham Road Illustrative Scheme GA Elevation (west) Sheet 5 A11113 C 2 204 Rev P6
ID10 80 Caversham Road Site Location Plan with Application Boundary A11113 C 2 003 Rev P4
ID11 80 Caversham Road Illustrative Scheme GA Site Plan Ground Floor A11113 C 2 050 Rev P14
ID13 55 Vastern Road (SSE) storeys and heights
ID14 55 Vastern Road Context Site Elevation – Vastern Road 448.PL.201 Rev A
ID15 55 Vastern Road Context Site Elevation Street Section 448.PL.202 Rev A
ID16 55 Vastern Road Illustrative Masterplan 448.PL.SL.002 Rev E
ID17 Station Hill – 192032 – Storeys and Heights
ID18 (Plot G) Phase 2 – One Station Hill Elevation East SHRN-GEN-BG-ZZ-PL-A-1303
ID19 (Plot G) Phase 2 – One Station Hill Elevation North SHRN-GEN-BG-ZZ-PL-A-1300
ID20 (Plot G) Phase 2 – One Station Hill Elevation South SHRN-GEN-BG-ZZ-PL-A-1302
ID21 (Plot G) Phase 2 – One Station Hill Elevation West SHRN-GEN-BG-ZZ-PL-A-1301
ID24 May Rebuttal Figures by Michael Doyle received 2nd May 2022
ID25 Design Code May 2022 received 2nd May 2022
ID26 Building Heights Comparisons by Collado Collins Architects received 2nd May 2022
ID27 Note on Vehicular and Service Access from Trooper Potts Way received 2nd May 2022
ID28 Evidence in Chief Powerpoint Presentation Roy Collado, received 2nd May 2022
ID29 Building Heights Comparisons Rev B by Collado Collins Architects, received 3rd May 2022
ID30 Building Heights Comparisons Rev C by Collado Collins Architects, received 4th May 2022
ID33 Revision A – Additional Material – Vastern Road Sections dated 11th July 2022, received 13-7-22
ID34 Agreed Draft Conditions 6th May 2022
ID35 Not Agreed Draft Conditions Including Commentary from the Council 6th May 2022
ID38 55 Vastern Road Map – Historic England 8-3-22
ID39 Note on Vastern Road Tree Planting and Services Dated 9-05-22
ID41 Open Space Inspector’s note – Council Responses 10-05-22
ID42 Station Square North and South Comparative Areas Draft 01, received 10-5-22
ID43 Nick Bridgland Note on 55 Vastern Road dated 11-5-22
ID43.1 Historic England Not Listable Decision Summary for 55 Vastern Road, dated 17-3-22
ID46 Station Square North and South Areas V3 by Doyle 12-5-22
ID47 Updated Cumulative Wirelines received 13-5-22
ID49 Overlaid Cumulative Wirelines, by Michael Doyle, dated 21-6-22
ID51 Vastern Ct Open Space Inspector’s Note – Appellant Responses 27-05-22, received 10-6-22
ID54 Vastern Court – Daylight and Sunlight Presentation by Dr Paul Littlefair dated 24-6-22
ID55 Sustainability Statement of Common Ground Revision D with RBC Comments 21-6-22
ID56 CHP Surveyors Ltd Letter Dated 30-5-22
ID58 Agreed Draft Conditions Vastern Court 06-05-22 Inspector’s comments RBC comments 13-7-22
ID59 Inspector’s Note re Disputed Conditions with RBC Comments 13-07-22
ID61 Amended Development Parameters Schedule July 2022, received 14-7-22
ID61 Revision A Updated Development Parameters Schedule 12-10-22, received 17-10-22
ID62 Design Code by Collado Collins Architects 14th July 2022
ID66 Council’s Response to Revised ID33 29-7-22
ID67 Updated Design Code August 2022, received 18-8-22
ID68 RPA for Trees Caversham Road, dated 18-8-22, received 19-8-22
ID69 LPA’s response to ID68 ‘RPA for Trees Caversham Road’ dated 26-8-22
ID70 Joint Response by CHP and BRE on Daylight and Sunlight 16-9-22
ID71 Supplementary Statement Design and Townscape by Michael Doyle 20-9-22
ID72 Revision A – Revised Agreed and Not Agreed Draft Conditions Vastern Court with comments 7-11-22
ID72 Revised Agreed and not agreed Draft Conditions 23-09-22 ‘clean copy’ with comments
ID73 S106 Joint Position Statement 23-9-22
ID74 Parameter Plan – Site Access & Egress Option 1 Hermes First PP-115 Rev P1
ID75 Parameter Plan – Site Access & Egress Option 2 Aviva First PP-116 Rev P1
ID77 Appellant Response to Supplementary Statement Design and Townscape (ID76) 28-9-22
ID78 Note on Submission by Appellant on Daylight and Sunlight Issues by Dr. Littlefair, 3-10-22
ID79 Reading Borough Council Inspector’s Report 24th September 2019
ID80 Email from Appellant re Drawing Reference Numbers used by CHP Surveyors received 5-10-22
ID81 Email from Appellant to Planning Inspectorate with Details of Land Ownership of Proposed Station Square North, received 6-10-22 (refer also to ID81.1-81.4)
ID81.1 Official Copy (Register) – BK222369
ID81.2 Official Copy (Title Plan) – BK222369
ID81.3 Official Copy (Register) – BK449855
ID81.4 Official Copy (Title Plan) – BK449855
ID83 Updated CIL Compliance Statement – 9-11-22
ID84 Addendum to CIL Compliance Statement – 14-11-22
ID85 Note of Clarification on Building Storey Heights 15-11-22
ID86 Note of Clarification on Measured Building Areas 14-10-22, received 17-10-22
ID87 LPA Response on Building Storey Heights 10-11-22
ID88 LPA Response on Measured Building Areas 10-11-22
ID90 Note on Environmental Statement and Planning Conditions 7-11-22
ID92 Updated Environmental Statement Compliance Letter, by Ramboll 7-11-22
ID93 Email From Tim Stansfeld CMS-CMNO Regarding Agreed Outstanding S106 Points 10-11-22
ID94 Final S106 Legal Agreement Signed – 30-11-22
ID94.1 Final S106 Legal Agreement Signed Annexes 1-9, 30-11-22
ID95 Site Layout Planning for Daylight and Sunlight – A Guide to Good Practice – BRE – 2022
ID96 Final Closing Submission on Behalf of the Council 16-11-22
ID97 Final Closing Submission on Behalf of the Appellant 16-11-22
ID98 Appellant Agreement to Pre-Commencement Conditions in ID72 Revision A 23-11-22